EMS application scenario - Off-grid PV+BESS+DG System

EMS Strategy

Microgrid Power Dispatch

Microgrid Voltage and Frequency Regulation

PV Power Absorption

Backup Power Control

Normal Operation Mode: Under normal conditions, the DG remains off. The BESS operates as the grid-forming master for the microgrid using VSG control technology, autonomously maintaining system frequency and voltage stability. The PV system operates in grid-following (P/Q) mode, injecting power into the microgrid.

Low SOC Transition and Optimized Operation: When the BESS SOC drops to a low threshold, the EMS starts the DG to run at 0 kW. Once the BESS SOC reaches the minimum allowable limit, the BESS is shut down, and the DG automatically picks up the load, achieving a 0ms transition. The ESS then begins charging, prioritizing the absorption of available PV power. When the load demand is low, the EMS increases the BESS charging power to elevate the DG output, ensuring it operates within its optimal efficiency range.


Make energy smarter and life better!
© 2025 Shanghai UWinEra Technology Co., Ltd. All Rights Reserved
Contact Info
1-2F, Building 4, 1628 Lizheng Road, Lingang New Area, China (Shanghai) Pilot Free Trade Zone
+86-195 3352 8551
Company
Powered by Feedback Subscribe Data